Construction

Watch it
take shape.

Ivy No. 11 is under construction at 11 Ivy Street. Here is where the building stands today — from the air, and from inside the frame.

Latest Update · Summer 2026

Out of the ground, under cover.

The structure is topped out and weathertight. Windows are set, the roof membrane and stair bulkheads are complete, and exterior siding has begun — which means the interiors can now be built out through the winter regardless of the weather.

Complete

Foundation & structure

Excavation, foundation, and three stories of framing, topped out to the roof deck.

Complete

Roof & bulkheads

Roof membrane laid and the stair bulkheads framed for the penthouse roof decks.

Complete

Windows & weather barrier

Black-framed windows set and the full ZIP System envelope sealed against the weather.

Underway

Exterior siding

Fiber-cement cladding going on elevation by elevation, over the sealed envelope.

Progress shown is current as of the latest site visit and is subject to change.

From Above

The site, from the air

Sheathing, windows & roof bulkheads complete
The roof, from directly above
Exterior siding underway
The site on Ivy Street
Looking west toward Fresh Pond
Boston on the horizon

Select any photograph to view it full screen.

On Site

Inside the frame

Two short walkthroughs filmed on site — the building as it stands, and the design team working through the homes room by room.

The building todayExterior, roof, and the penthouse levels
Design team on siteWalking the homes as they are framed

Best with sound.

Stay Close

Follow it through

The best way to understand the building is to walk it. We run hard hat tours by appointment as construction allows — or register and we will keep you posted as the homes are released.

Tours are by appointment and subject to site conditions. Hard hats and closed-toe shoes are required, and are provided on arrival.